How it works

From scan to installed façade.

Moduvo links digital capture, parametric design and CNC manufacturing into one continuous process — so complexity moves from the construction site into controlled production.

THE SYSTEM

From existing façade to renovated façade.

Point cloud scan of an existing brick façade with measurement linesFIG. 01
  1. 01Existing façade
  2. 023D scan
  3. 03Parametric model
  4. 04CNC production
  5. 05Surface finishing
  6. 06Prefab modules
  7. 07Fast installation
  8. 08Renovated façade

HOW IT WORKS

01

Scan

Digitally capture the full surface of the existing façade: geometry, relief and colour.

Digital capture · point cloud · colour and texture reference

Scan — Digitally capture the full surface of the existing façade: geometry, relief and colour.01
02

Model

Translate geometry, rhythm, relief and details into a parametric digital model.

Parametric modelling · tolerance handling · module division

Model — Translate geometry, rhythm, relief and details into a parametric digital model.02
03

Design

Preserve, reinterpret or redesign the façade together with the architect.

MULTIPLE DESIGN OPTIONS · MODULE DIVISION

Design — Preserve, reinterpret or redesign the façade together with the architect.03
04

Make

Convert the digital design into CNC-manufactured prefab elements. Application of colour and a waterproof coating.

CNC manufacturing · insulation · surface finishing

Make — Convert the digital design into CNC-manufactured prefab elements. Application of colour and a waterproof coating.04
05

Install

Bring the finished system to site for fast, low-disruption installation.

Fastening system · connection details · site sequencing

Install — Bring the finished system to site for fast, low-disruption installation.05

TECHNICAL PERFORMANCE

Designed based on detailed engineering.

The systems' strength lies in addressing both the key challenges and finer details: thermal performance, water management and connections with joinery are part of the design from the first prototype.

In development

Thermal performance

Continuous insulation layer and reduction of thermal bridges.

In development

Water management

Watertight at module transitions and connections to existing façade elements. A vapour-open result.

Testing

Durability

Ageing, weathering and maintenance behaviour of the outer finish.

Validation in progress

Fire performance

Material selection and build-up in relation to façade fire requirements.

In development

Connection details

Connections to windows, doors, sills, roof edges and other façade openings.

Prototype

Installation

Fast installation without demolition, invisible fastening and accommodating tolerances.

Improve the performance.Keep the character.